Leave a request
Super User

Super User

Tuesday, 10 March 2020 09:40

Vacancies

There are currently no vacancies
 
 

HR Department Contacts
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
T: +7 705 350 84 13

 

Tuesday, 10 March 2020 09:40

Projects

Completed projects

Completed projects

Over a period of more than 50 years, the team has built power transmission lines with a voltage of 35-500 kV both for creating a power system and for external power supply to industrial enterprises, including: phosphorous, tire, oil refining and cement plants in Shymkent and Sas-tobe village, the mines of the Achpolimetal and Baizhansai combine.
The railway electrification project was implemented to connect 220 kV "Tyulkubas"," Kyzylsay"," Badam"," Arys"," Moytantash","Zhideli" traction substations.

1980 / 1989

Built and put into operation: 500 kV overhead line — 1950 km, 220 kV overhead line — 3500 km, 110 kV overhead line — 25550 km, 35 kV overhead line — 1500 km, 10 kV overhead line — 20000 km.

The first 500 kV overhead power lines in the South of Kazakhstan "Chimkent-Tashkent GRES", 500 kV overhead power lines of "Leninskaya" substation, 500 kV overhead power lines of "Syrdarya" substation, Guzar substation, 500 kV overhead power lines of "Regar" substation were built. A significant contribution was made to the electrification of rural areas of the region.

1990 / 1999

The construction of strategic facilities to support the electrification of the city of Shymkent, in particular, the 110 kV Leninskaya-Zapadnaya overhead line, the 220 kV SEZ Ontustik substation, the 35/10 kV Nur-Sat substation with the removal of the 35 kV overhead line from the development zone of the Nursat microdistrict, the 110 kV double-chain overhead line, the Shymkent substation of YUPM CJSC, the 110 kV double-chain overhead line, the Inkai substation, and the RU-6 substation with a length of 160 km.

A 110 kV overhead line "PS Balkhash-PS NPS 9"was built for the power supply of pumping stations at the Atasu (Kazakhstan) — Alashankou (China) oil pipeline that was at construction stage.

2000 / 2020

In 2001, the 35 kV GPP-2 – GPP-M2 substation of the Katko JV was built. In 2005, a double-chain 110 kV overhead line was built. "Sholak – Kurgan – Tortkuduk PS" with a length of 105 km for the electrification of plants under construction.

Construction and installation works on mine electrification, installation of complete transformer substation of outdoor installation, construction of 110 kV substation, installation of 10 kV overhead line, 35 kV overhead line, 110 kV overhead line were performed for Inkai LLP JV

In 2007-2008, construction and installation work was performed on the first unique 220 kV block substation in Kazakhstan, concrete complete transformer substation (M) 220/10-5 AN, manufactured by "UK "Electroshield" TM Samara" LLC.

In 2010-2011, the construction of a 110 kV switchgear was performed within the framework of the project "Expansion of the Kumkol GTU" for "PetroKazakhstan Kumkol Resources" JSC.

Since 2010, work has been carried out on the construction of technological injection and pumping wells at the Yuzhny Moinkum field for Katko LLP JV. In 2011-2013, work was carried out on the construction of technological in and out pumping wells at the Kharasan-2 field, more than 360 km of pumping and pumping wells were developed for "Bayken-U" LLP.

In 2008-2010, the construction project "On-site engineering networks (water supply, sewerage, electricity, telephony, gas supply) of the special economic zone of the SEZ "Ontusik" of the South Kazakhstan region was completed. Water supply facilities No. 1 and No. 2 and "Sewage pumping station".

In 2010, the construction of the repair and production base of "Uranenergo" LLP in the village was completed in Shieli village and creation of the telecommunications system (ETS) of Uranenergo LLP.

Construction and installation works have been carrying out for "Katko" LLP JV for 10 years. The work included construction of service sites, including earthworks of varying complexity, electrification of construction sites, laying of HDPE pipelines and fiberglass pipes "Hobas", installation of drain wells and wells for plunger, installation of lightning protection and lighting of sites, construction of a shift camp, construction of a 50-ton car weight, construction of concrete platforms, construction of on-site engineering networks, fencing.

In 2011-2012, general construction works were carried out for "Bayken-U" LLP on the construction of a technological road, construction of the main productive and leaching pipelines together with repair and restoration works, the construction of acid pipelines, the installation of sludge accumulators and the vertical layout of blocks for technological drilling of wells.

In 2017-2019, work was performed on the construction of technological injection and pumping wells at the Ortalyk and Appak fields, more than 150 pumping and pumping wells were developed for "Volkovgeologiya" JSC.

In 2019-2020 the Completion of electrification of settlements.Yergaliyeva, Zhanbay, Zineden, Tushchykuduk, Isatay district, Atyrau region project was implemented.

In 2020, work began on "Construction of engineering infrastructure and landscaping of multi-storey residential buildings with social and public service facilities and a sports and recreation complex at 74B, 74B, 74G Abilkayyr Khan Ave. microdistrict Nursaya Atyrau " (off-site power supply networks and on-site power supply networks)".

Tuesday, 10 March 2020 09:40

Special equipment

Special equipment

Special equipment

"Mechanized Column No. 49" LLP has a large fleet of vehicles. Here you will find all types of equipment in perfect working condition.

The fleet of special vehicles is constantly expanding, annually replenished with new units of construction and road equipment.

Over the past 5 years, we have earned the trust and appreciation of our customers by providing special equipment for rent to leading industrial companies.

See full list of special equipment

  • Rss 5690
Special equipment

Special equipment

Rental of special equipment is a right solution, which will save you money and increase the efficiency of your work. If necessary, the company's specialists will help you choose special equipment for solving a variety of tasks and problems.

Leave a request

Tuesday, 10 March 2020 09:40

Drilling

Drilling operations:

Construction of exploration, hydrogeological, and technological wells;
Search and exploration of reservoir-infiltration uranium deposits for further development of the uranium raw material base in the Republic of Kazakhstan;
Work on the assessment of the state of the radioecological situation in the territory of Kazakhstan and radioecological support of geological exploration and technological drilling;
Analytical work on the determination of radioactive and related elements in rocks and underground waters;
Provision of environmental services;
Handling of ionizing radiation sources;
Design and operation of mining operations;
Production and repair of mobile drilling rigs;
Production and overhaul of mining and drilling tools, equipment and vehicles;
Transportation of radioactive waste;
Reclamation of territories and objects contaminated by radiation.
  • Tb
Tuesday, 10 March 2020 04:07

Contacts

Contacts

Dzerzhinskogo street, 2a, Shymkent, South region of Kazakhstan, 160001, Republic of Kazakhstan.

+7 701 228 94 51

This email address is being protected from spambots. You need JavaScript enabled to view it.

Посмотреть на карте Шымкента

Electrification and construction of objects

Nowadays the main activities of "Mechanized Column No. 49" LLP are the implementation of works in the field of architectural, urban planning and construction activities in the territory of the Republic of Kazakhstan.

2000+

Qualified employees with extensive experience

50000km+

Qualified employees with extensive experience
 
Design of engineering systems and networks;
Installation of switchgears and substations with voltage up to 220 kV and above;
Installation of overhead power lines with a voltage of up to 500 kV and above;
Installation of cable power lines with a voltage of up to 35 kV;
Installation of connection and end couplings up to 35 kV;
Earthworks;
Ground connection installation;
Installation of current lines and busbars with a voltage of up to 35 kV;
Manufacture of electrical products and cable trays;
Production of electrical structures with a voltage of up to 10 kV;
Excavation and commissioning works;
Construction of load-bearing and enclosing structures of buildings and structures for electrical purposes;
Special construction and installation works;
Works on the installation of external engineering networks and structures;
Work on the installation of internal engineering systems;
Installation of electrical equipment and instrumentation;
Installation, adjustment and maintenance of fire alarm and automation equipment;
Operation of electrical networks and substations;
Special work on the protection of structures and equipment.
 

Electrical measurement works

The MK 49 company has its own electrical laboratory and performs
electrical measurement works from 0.4 to 10 kV.

  • Detection of fault location on Underground cable and Overhead lines;
  • Testing and diagnostics of power transformers;
  • Murement of the "phase-zero" circuit»;
  • Measuring the resistance of electrical wiring and cables;
  • Testing of electrical equipment with increased rectified voltage, as well as with increased industrial frequency voltage (UL, OL, switching substation);
  • Performing preventive tests;
  • Testing of cable lines;
  • Insulation resistance tests;
  • Any other types of tests at the request of the customer;
  • We provide a test report.

 

Tuesday, 10 March 2020 03:54

About company

About company

Nowadays the main activities of "Mechanized Column No. 49" LLP are the implementation of works in the field of architectural, urban planning and construction activities in the territory of the Republic of Kazakhstan.

  • Ishmetov Rakhimzhan Mahmutzhanovich General Director
  • Pazylvaev Elerzhan Sultanmuratovich Deputy General Director

500+

Qualified employees with extensive experience

50000км+

High-voltage lines built and put into operation
"Mechanized Column No. 49" LLP was founded on April 1, 1963. We operate not only on the territory of the Republic of Kazakhstan, but also in the countries of Central Asia. Throughout its existence, the company has been developing dynamically, acquiring the latest equipment and special equipment for performung the work. Our team always studies actively and use new advanced technologies in the field of construction.

Скачать каталог

65 years

A huge experience proven by time

100+

Own base of the special equipment fleet
"Mechanized Column No. 49" LLP has a license of GSL No. 003412 for performing construction and installation works on the Category I.

Leave a request

The company has its own production base, a fleet of special equipment and a staff of qualified and experienced employees.
Over the time of its existence, the team has built and put into operation more than 50,000 kilometers of high-voltage lines.
In 2008, a new type of activity was developed — the reclamation of radiation areas and facilities.
Since 2009, the company has been drilling wells for geological exploration works and installation of technological pumping in and out wells.
There is a private recreation center "Red Rocks" in the picturesque Ak-Mosque gorge for employees and guests of the enterprise.
  • G6
  • G2
  • G3
  • G4
  • G5

Licenses and certificates

  • Выдача разрешений на применение технологий Kz
  • Эксплуатация3
  • аккредитация электролабораторий Kz
  • аккредитация электролабораторий Ru
  • аттестация юридических лиц Kz
  • аттестация юридических лиц Ru
  • выдача Ru
  • обращение 1
  • обращение 2
  • обращение 3
  • проектирование2
  • проектирование 1
  • проектная 1
  • проектная 2
  • свидетельство 1
  • свидетельство 2
  • сертификат 1
  • сертификат 2
  • сертификат 3
  • сертификаты 2018 01
  • сертификаты 2018 02
  • сертификаты 2018 03
  • сертификаты 2018 04
  • сертификаты 2018 05
  • сертификаты 2018 06
  • сертификаты 2018 07
  • сертификаты 2018 08
  • сертификаты 2018 09
  • сертификаты 2018 10
  • сертификаты 2018 11
  • сертификаты 2018 12
  • смр 1 1
  • смр 1 2
  • смр 1 3
  • смр 1 4
  • строительно 1
  • строительно 2
  • строительно 3
  • строительно 4
  • эксплуатация1
  • эксплуатация2